How many shops should you quote before choosing one?

Updated 2026-11-15 · CHX Precision Metal

Three is the practical number: enough to see whether a price is an outlier, few enough that each one gets a detailed response. Two gives you a coin toss. Five or more usually gets you four template replies and one real one, two weeks later.

Why three

With two quotes you know there is a spread, not which side is unusual. With three you can see whether the middle value is a real market level or whether two shops happen to be aligned. With four, the fourth quote almost never changes the decision - by then you already know the range.

There is a second, less obvious reason. Shops triage enquiries. A buyer who sends the same drawing to eight suppliers often gets eight quick estimates, because nobody expects to win it. A buyer who sends it to three gets at least one shop that reads the drawing and comes back with questions - and that shop is usually the one worth using.

What the spread means

Spread across three quotesLikely explanationWhat to do
Within 10%Same route, same assumptionsChoose on lead time and communication
20-40%Different route or different finishing scopeAsk each for the process route before deciding
50-100%One quote misunderstood the drawing, or one is a rush quoteAsk for the route; also ask what changes if the tolerance is relaxed
Over 100%Different process entirely (e.g. EDM vs milling) or a shop that does not want the jobTreat the high quote as a signal, not a price

A high quote is information. It often means the shop would have to buy a tool, build a fixture or subcontract a step - which tells you something about your part that the cheap quotes did not mention.

Making quotes comparable

Three quotes on three different assumption sets are not a comparison. Before you send the RFQ, put these in it:

  1. Drawing revision and material grade, stated explicitly (not "aluminium").
  2. Lot size, and the lot size you expect to repeat at.
  3. Tolerance expectation: full drawing, or note which dimensions can run to the general tolerance.
  4. Finishing: included or quoted separately.
  5. Inspection: what report you expect.
  6. Delivery term and destination.

Then ask each shop to quote in the same structure. A quote that arrives as a single number with "ex works" at the bottom cannot be compared to one that breaks out material, machining, finishing and inspection.

When to quote more than three

The signals that matter more than price

After the quotes come back, the deciding factors are usually not the number:

SignalWhat good looks likeWhat should worry you
Response to the drawingQuestions about a specific featureA price with no questions
Process descriptionNames the machine and the number of setups"We can do it"
Tolerance commentFlags the dimensions that will be difficultSilence on a ±0.005 callout
Lead timeA number of days plus dependencies"As soon as possible"
FinishingNamed subcontractor, named process"Standard finish"

A note on samples

If the part is critical, buy one sample before the batch - from the shop you are about to choose, not from all three. A sample costs a prototype price and answers the only question that matters: can this shop make this part. Three samples tells you three shops can or cannot; one sample tells you whether your choice works.

What actually happens when you send eight RFQs

In practice, eight enquiries produce a predictable pattern: three replies within 48 hours, two replies after a reminder, two "we will revert" that never revert, one that quotes a completely different part because an attachment did not open. The three fast replies are the ones you would have got from a three-shop RFQ - you have simply spent more time managing the other five.

There is a real cost to the buyer here: every quote has to be read, compared and answered with questions. Five comparable quotes take an afternoon to process; three take forty minutes and produce the same decision.

A comparison sheet that works

Put the quotes in a grid with the same rows for everyone. The rows that matter, in order:

RowWhy it decides the choice
Unit price at your actual lot sizeQuotes at a different quantity are not comparable
Setup / tooling charge, one-offOften the real difference on small lots
Process route (machine, number of setups)Explains the price, and predicts the lead time
Finishing included?The most common hidden gap
Inspection included?The second most common
Lead time, with dependenciesExcludes material ordering, usually
Delivery termEXW vs FOB changes the total by 15-25%

Fill it in before talking to anyone. Whichever shop cannot fill a row is the one to question - not necessarily to reject.

The one thing not to do

Do not tell a shop its competitor's exact price. It invites a cut that gets recovered somewhere invisible - a thinner coating, a skipped first article, a different material grade. Tell it the budget range if you need to; do not tell it the other number.

Questions buyers ask

Is it rude to send the same drawing to several shops?

No, it is normal practice, and shops assume it. What is discourteous is telling a shop it has the order while still collecting quotes.

Should I tell each shop what the others quoted?

You can tell a shop it is not the lowest, without naming the number. Naming a competitor's price invites a cut that is recovered elsewhere - in finishing, inspection or material grade.

What if the cheapest quote is also the fastest?

Then check scope: finishing, inspection, material certification and packing. A quote that is both cheapest and fastest is usually either genuinely efficient or quoting a narrower scope.

How long should I wait for quotes?

Three to five working days for a normal part. A shop that needs two weeks to estimate a simple turned part either does not want the job or does not have an estimator.