CHX Precision Metal

Mill certificates and heat numbers: what traceability proves

Updated 2026-11-15 · CHX Precision Metal

A mill certificate proves what a mill poured. Traceability proves that the metal in your part came from that pour. The link is the heat number, and it only works if it appears on the purchase record, the warehouse label, the job traveller and the final inspection report. A certificate with no heat number is a brochure.

Three certificate types, three levels of evidence

TypeWhat it isWho signs itWhat it proves
EN 10204 2.2Declaration of compliance with the orderSeller, not independentThe seller says the material meets the spec
EN 10204 3.1Inspection certificate, specific test resultsMill's authorised inspection repChemistry and mechanical results from the actual heat
EN 10204 3.2Inspection certificate with third-party witnessMill plus independent inspectorSame as 3.1, witnessed by a third party

For most industrial buyers, 3.1 is the standard ask. 2.2 is common for commodity grades and tells you much less - it is a statement, not data. 3.2 is for pressure, nuclear and similar scopes, and adds cost and lead time.

The chain that has to hold

  1. Purchase record - the mill or stockholder invoice, with heat number and quantity.
  2. Warehouse label - the bundle or bar end marked with the heat number when it is received.
  3. Job traveller - the heat number copied onto the work order that consumes that bar.
  4. Inspection report - the same heat number on the certificate that ships with the parts.

Break any link and the certificate becomes an assertion about a different piece of metal. The usual break is at the warehouse: bars go into a rack, labels fall off, and the next job takes "some 6061" from the rack. A shop with a real traceability process marks the bar end and keeps remnants with their heat numbers.

Where substitution actually happens

SubstitutionWhy it happensWhat it costs the buyer
6063 instead of 6061Cheaper, machines faster, often in stockLower strength (T5 vs T6); anodises slightly differently
303 instead of 304Free-machining grade, much faster on a latheLower corrosion resistance; not for food or medical
304 instead of 316LAvailability, priceChloride pitting; fails in marine or chemical service
Chinese grade "equivalent"Mill uses its own designationChemistry within spec or not - only the 3.1 certificate tells you
Remnant bar of unknown heatConvenienceNo traceability at all

None of these are necessarily dishonest. 6063 is a legitimate alloy; the problem is a drawing that says 6061-T6 and a part made from 6063-T5. The buyer finds out at anodising, or at the strength test, or never.

How to make the certificate useful

Independent verification

If the material is critical and the paperwork is thin, a hand-held XRF analyser gives a rapid alloy check - it will separate 304 from 316 and 6061 from 6063 in seconds, in the receiving area. It will not give mechanical properties or a full chemistry, but it catches the substitution that matters most.

For full confirmation, a coupon from the same bar can go to a laboratory for chemistry and tensile testing. That costs more than the certificate and takes a week, which is why it is reserved for the parts where a material failure is not survivable.

What a certificate does not tell you

Lot splitting, and why it matters at receiving

A 2,000-piece order may be produced from three different bars, therefore three heat numbers. If the inspection report quotes one heat number, either the order was made from one bar - possible for small parts - or the report is only valid for part of the lot.

The practical check: on a lot above a few hundred pieces, ask how many heat numbers are involved and whether the packing list records which cartons came from which. A shop that can answer this in one sentence has real traceability; a shop that has to go and ask someone does not.

Receiving checklist for material documentation

CheckPass conditionCommon failure
Certificate type3.1 with test results2.2 statement only
Heat number presentOn certificate and packing listOnly on the certificate
Chemistry vs gradeWithin spec for each elementGrade name correct, chemistry from a different grade
Condition / temperT6, T651, annealed - statedSilent on temper
Quantity traceableHeat numbers mapped to cartonsOne heat number quoted for a multi-bar lot

Run this list against the first delivery, not the tenth. A supplier whose documentation passes on the first lot will usually keep passing; one whose documentation is assembled afterwards will show it immediately, and it is much cheaper to find that out before the parts are in a machine.

Questions buyers ask

Is a mill certificate the same as a material certificate?

Usually used interchangeably, but the certificate is only the document. What matters is whether it carries specific test results (3.1) or only a statement of compliance (2.2).

What if the supplier cannot provide a heat number?

Then the material is untraceable. For non-critical parts that may be acceptable; for anything with a strength, corrosion or regulatory requirement, it should disqualify the lot.

Does 6061 vs 6063 matter for anodising?

Yes. 6063 anodises to a slightly brighter, more uniform finish and is common for architectural work; 6061 is stronger and takes dye a little differently. Mixing them in one batch produces visible colour variation.

Can XRF replace a mill certificate?

No. XRF confirms the alloy family, not the heat treatment, mechanical properties or the full chemistry. It is a screening tool for substitution, not a substitute for documentation.

Do small orders need a 3.1 certificate?

If the part has a strength or corrosion requirement, yes - the cost is usually a small document fee. For brackets and covers where any 6061 will do, 2.2 plus an XRF check is often enough.

Material certificates ship with the inspection report, heat number matched to the lot.

quality and inspection